Deralok Dam

Deralok Dam
Location of Deralok Dam in Iraq
Country Iraq
Location Deralok, Dohuk Governorate
Coordinates 37°4′17.12″N 043°39′28.88″E / 37.0714222°N 43.6580222°E / 37.0714222; 43.6580222Coordinates: 37°4′17.12″N 043°39′28.88″E / 37.0714222°N 43.6580222°E / 37.0714222; 43.6580222
Purpose Power
Status Under construction
Construction began 2015
Opening date 2019 est.
Construction cost US$129 million
Owner(s) Kurdistan Regional Government
Dam and spillways
Type of dam Gravity, diversion weir
Impounds Great Zab
Height 30 m (98 ft)
Length 120 m (390 ft)
Power station
Name Deralok Hydropower Station
Commission date 2019 est.
Type Run-of-the-river
Turbines 2 x 18.8 MW Kaplan-type
Installed capacity 37.6 MW

The Deralok Dam is a gravity dam currently being constructed on the Great Zab River just upstream of the town of Deralok in Dohuk Governorate, Iraq. For its primary purpose, the dam will support a 37.6 MW run-of-the-river hydroelectric power station. Construction on the dam began in November 2015 when Kurdish Prime Minister Nechirvan Barzani inaugurated the project..[1][2] The US$129 million contract to build the dam and power station was awarded to a Boland Payeh-Farab Consortium. It is being financed by the Japan International Cooperation Agency. The project is expected to be complete in mid-2019.[3]

References

  1. ↑ "Loan Agreement No. IQ-P15, Deralok Hydropower Plant Construction Project". DG Markets. 21 April 2013. Retrieved 20 April 2016.
  2. ↑ "PM Barzani Opens Deralok Hydropower Project". Iraq Business News. 23 November 2015. Retrieved 20 April 2016.
  3. ↑ "Deralok Dam". Boland Payeh. Retrieved 20 April 2016.
This article is issued from Wikipedia - version of the 4/20/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.